Pivotal Project Management partnered with Mosaic Bioscience to plan and execute the relocation of their laboratories and offices from their existing facility to a newly constructed space in Boulder, Colorado. Recognizing the critical need to maintain the integrity of ongoing research, Pivotal meticulously managed the move of sensitive laboratory equipment, including specialized instruments and IT infrastructure. By strategically phasing the move event and ensuring clear communication, Pivotal’s lab relocation project management services enabled Mosaic Bioscience to continue their vital research trials with minimal interruption. 

Project Stats

  • Moved three labs and office space in a singular move event
  • Provided specialty move equipment to relocate large, delicate items
  • New facility size: 25,250 ft2
  • Employees relocated: 45
  • +/- 14 dry-van round trips of materials in two move events 
  • Reduced our client’s overall cost expectations through correct vendor selection and on-site management.
  • Ensured gainful occupancy despite ongoing construction during multi-phase move event.
  • Worked closely with GC to determine proper benchmarks to suggest proper days to conduct move events 

Lab Relocation Project Summary

Pivotal Project Management delivered expert Laboratory Relocation Consulting and Move Management services to Mosaic Bioscience, ensuring minimal disruption to their critical research activities. Recognizing the unique challenges of relocating active laboratories, Pivotal developed a strategic two-phase move plan informed by a thorough inventory process and understanding of Mosaic’s operational needs. This approach allowed specific employees to maintain access to essential equipment at each location throughout the four-week transition. 

The carefully orchestrated move involved the relocation of four laboratories and office spaces, utilizing specialized handling for sensitive scientific instruments and IT infrastructure. Pivotal’s proactive on-site management and close coordination with the general contractor ensured a seamless transition to the new 35,450 square foot facility, allowing Mosaic Bioscience to continue their essential research projects without significant downtime. 